PAST PROJECTS

KAJE ENGINEERING

INTELLIGENT FLOW SOLUTIONS

Past Projects

Sandra Project

Kaje Engineering has been involved as a subcontractor to a small project initiated by the outcome of SANDRA SP5. Our main objective were on collecting input in relation to a business case. The primary objective in SANDRA SP5 was to design and develop a novel phased array antenna to receive and transmit L-band SBB Satcom and to receive Ku-band DVB Satcom. 

Server farm Project

Kaje Engineering has been involved as a subcontractor in an IT project, where the main objective was to deliver the business case for moving a

on-site server farm to a hosted solution with the specific requirements, there had to be synchronization between primary servers located in both USA and Europe and a separate fail-over solution in each region.

Airport Wheelchair Project

Kaje Engineering has been involved as a subcontractor in an IT project, where the main objective was to design a system for an airport service team to assign staff and keep track of the passenger with special needs from arrival to departure within the airport.

Airport Luggage Tracking Project


Kaje Engineering has been involved as a subcontractor in an IT project, where the main objective was to design a system for an airport security screening team to track any luggage passing through the TSA screening zone after baggage drop, monitor any manual intervention and to predict the staffing required in order to have a smooth flow of passengers and baggage through the security screening zones.


CONTACT

COOKIE POLICY PRIVACY POLICYWWW.KAJE.ENGINEERINGWWW.ITF4Y.NET • LINKEDIN

©Copyright All Rights Reserved KAJE Engineering 2003-2020 CVR/SE: DK-36424389